• Cedar Park Field Operation Expansion

Cedar Park Field Operation Expansion

The Cedar Park Field Operations project added two Pre-Engineered Metal Building (PEMB) structures to existing facilities, combining office space and truck bays. A key focus was seamlessly blending the additions with the original buildings through custom grout matching and closely matched exterior brick finishes. This design ensured a cohesive look while maximizing utility and operational efficiency. By integrating office and logistics spaces, the project enhanced functionality and streamlined transitions between tasks. The result reflects a commitment to meeting client expectations and improving overall facility operations.

© 2026 Trimbuilt Construction, Inc. All Rights Reserved.
Call Now (512) 832-1979